BIOROCK-S Installation in Berkshire

BIOROCK-S Installation in Berkshire

Location

Maidenhead, Berkshire

Project

2 Bedroom Annex with Studio.

System

BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit

Background

The client had the option to connect to the mains but the costs, permitting time, and access permits proved prohibitive. As the plant was to be located quite close to the building the client also wanted a plant without noise and with minimum maintenance. It was also planned to discharge to a nearby stream and required a high-quality final effluent.

Installation

Installation was carried out by the clients' contractor under the supervision of a BIOROCK engineer and was completed in less than 2 days.

Doriți să intrați în contact cu noi?

Contactați-ne acum pentru o evaluare GRATUITĂ a proiectului

Unde vă aflați?

DATELE DVS. DE IDENTIFICARE

Datele dumneavoastră de contact

Prefixul telefonului este setat automat după selectarea țării

Ce tip de produs vă interesează?

Dacă alegeți altceva, vă rugăm să specificați în câmpul de observații

Cum vă putem ajuta